← Projects

Central Asia and the world

Dubai

Ain Dubai

Ain Dubai, Dubai: 3D model
Loading the model…
Drag: rotate · Wheel: zoom · Shift + drag: panOne finger: rotate · Two fingers: zoom and panZoom in: double-tap a detail. Full view: double-tap an empty area.

Background

The project was announced in February 2013; the client was the Dubai developer Meraas. Construction on Bluewaters Island began in May 2015. Hyundai Engineering & Construction and Starneth Engineering were the main design and construction contractors. The wheel opened on 21 October 2021.

The structure consists of a rim, a rotating hub and a fixed spindle mounted on four legs. Each leg is 126 metres high. A total of 192 steel cables link the rim to the hub. The hub and spindle were made in the UAE and brought to the site by water, as they were too large to move by road. According to the operator, 11,200 tons of steel went into the structure. The wheel has 48 cabins, and one rotation takes about 38 minutes.

In March 2022 the wheel closed for "periodic enhancements" and then stood idle for more than two years. In April 2023 the operator said it would stay closed indefinitely. It officially reopened on 26 December 2024. On 5–6 March 2026 it was closed again as a precaution.

Sources

Artistic 3D models. Some details and the number of cabins are approximate. The motion is sped up for clarity.