Background

Aldar Properties of Abu Dhabi announced the project in 2007 and first expected to finish it in 2010. The global downturn pushed the schedule back, and construction began only in November 2010. In June 2013 Aldar awarded the main contract, worth 4 billion dirhams, to a joint venture led by Arabtec.

The tallest tower has 75 floors; according to the Skyscraper Center database, its structural frame is a composite of concrete and steel. HKR Architects, which delivered the project, rehearsed the construction sequence on a BIM model and tested the design against Astana's severe winters. WME Consultants and Connell Mott MacDonald were the structural engineers.

The complex opened in stages: the Abu Dhabi Mall shopping centre was commissioned in December 2019 and the 14-storey Sheraton hotel in March 2020. The works were originally due to finish in time for Expo 2017, but the tallest tower was completed only in 2022. The cost of the project was estimated at about 1.6 billion dollars.