Central Asia
Stadiums
Astana Arena

Background
The stadium opened on 3 July 2009 and was first named after the wrestler Kazhymukan Munaitpasov. Populous and Tabanlıoğlu Architects designed it, Buro Happold did the structural engineering, and Sembol Construction was the main contractor. The construction cost is given as about 185 million US dollars.
Steel trusses carry the roof and rest on four pylons at the corners of the stadium. Two movable sections close or open the space above the pitch in about 20 minutes; the club gives the area of the retractable roof as 10,000 square metres. The stands have two tiers: 16,000 seats in the lower tier run around the pitch, and another 14,000 are in the upper tier on the east and west sides.
On 14 October 2009 Kazakhstan played their first official match here and lost 1:2 to Croatia. The opening ceremony of the Asian Winter Games took place in the arena on 31 January 2011, and in the 2015/16 season FC Astana played their UEFA Champions League group-stage home matches here. In 2024 the stadium closed for a major overhaul: the roof and engineering systems were renewed and heated artificial turf was laid. On 15 September 2026 UEFA confirmed Astana Arena as the venue of the 2028 Super Cup.
Compare
Capacity, seatsNo. 5 of 10. 21,000 seats less than the leader.
- 1Bishkek ArenaBishkek51,000
- 2Olympic StadiumAshgabat45,000
- 3Pakhtakor StadiumTashkent34,000
- 3Bunyodkor StadiumTashkent34,000
- 5Astana ArenaAstana30,000
- 5National StadiumDushanbe30,000+
- 7Kopetdag StadiumAshgabat26,503
- 820-Letie Nezavisimosti StadiumKhujand25,000
- 9Central StadiumAlmaty23,804
- 10Markaziy StadiumNamangan21,913
Uzbekistan 3 · Turkmenistan 2 · Kazakhstan 2 · Tajikistan 2 · Kyrgyzstan 1
On the map
Artistic models based on photographs. Some details are simplified. The movement of the Astana Arena roof is sped up for clarity.