← Projects

Central Asia

Astana

Talan Towers

Talan Towers, Astana: 3D model
Loading the model…
Drag: rotate · Wheel: zoom · Shift + drag: panOne finger: rotate · Two fingers: zoom and panZoom in: double-tap a detail. Full view: double-tap an empty area.

Background

The complex was built by Astana Property Management, a company of the Verny Capital group. The first stone was laid on 18 June 2013. The Ritz-Carlton hotel opened on 3 June 2017 in the presence of Nursultan Nazarbayev, and the office tower came into use in September of the same year.

The office tower has 30 floors and the hotel and residential tower has 26. As the Skyscraper Center describes it, the lower part of the office tower uses steel columns and beams, while the upper part has a reinforced concrete core, columns and floor slabs. Because of Astana's frosts the facade has floor-to-ceiling triple-glazed units, and the outer cladding is Jura limestone quarried in Germany.

In March 2018 the complex received LEED Gold certification. Forbes Kazakhstan writes that it was the first property in Kazakhstan to be certified under LEED and that electricity consumption was cut by 24 percent. The hotel has 157 rooms, and 27 residences occupy the upper floors.

Sources

Artistic 3D models of the buildings. They are not architectural drawings to exact scale.