← Projects

Central Asia

Astana

KTZ

KTZ, Astana: 3D model
Loading the model…
Drag: rotate · Wheel: zoom · Shift + drag: panOne finger: rotate · Two fingers: zoom and panZoom in: double-tap a detail. Full view: double-tap an empty area.

Background

The building went up on Astana's left bank as the head office of the national company Kazakhstan Temir Zholy; the architect Tolegen Abilda is the author of the design. The Skyscraper Center database gives 2005 as the start of construction. In July 2009, on the eve of Capital Day, the company's president Askar Mamin presented the new office to Nursultan Nazarbayev.

Two towers, semicircular in plan, rise from an eight-storey rectangular base: one has 40 floors, the other 37. Three skybridges link them at floors 15, 21 and 27. The frame is cast-in-place reinforced concrete, the towers stand on bored piles 600 mm in diameter, and the facade is glazed with dark blue glass from the Belgian firm Glaverbel.

According to the company's 2025 figures, the building has a floor area of more than 102,000 square metres and about 3,600 people work in it. It houses an automated traffic control centre, an 800-seat assembly hall, a swimming pool and a sports hall. An atrium under a glass rooflight sits in the middle of the eight-storey part, and a media screen is mounted on the north facade facing the Water-Green Boulevard.

Sources

Artistic 3D models of the buildings. They are not architectural drawings to exact scale.