Central Asia
Piramit Tower

Background
The complex stands in the Yakkasaray district of Tashkent, at the junction of Muqimiy and Bobur streets. The investor is the Turkish company Koç Construction, which gives the project period as 2021–2024. A project description by the firm Bir İnşaat lists the tower as having 52 storeys and the Piramit Mall shopping centre as having 6.
The same description gives a total construction area of 164,000 square metres, while Koç Construction states 160,000 square metres. The tower is planned to hold apartments and offices as well as a swimming pool, a spa, a cinema and a fitness centre. The underground car park is designed for 1,000 vehicles.
Compare
Height, mNo. 4 of 10. 125.8 m less than the leader.
- 1Abu Dhabi PlazaAstana310.8
- 2Nest OneTashkent266.5
- 3EmeraldAstana201
- 4Piramit TowerTashkent185
- 5Northern LightsAstana180
- 6KTZAstana175
- 7Esentai TowerAlmaty168
- 8SQBTashkent159.6
- 9Transport TowerAstana155
- 10Talan TowersAstana145.6
Kazakhstan 7 · Uzbekistan 3
On the map
Artistic 3D models of the buildings. They are not architectural drawings to exact scale.