Central Asia
Central Stadium

Background
The main arena was built in 1955–1958 to a design by chief architect Adambek Kapanov and A. Ya. Kossov. Work on the wider sports complex continued until 1975, when the indoor athletics arena was added. The stands were originally designed for 30,000 seats. FC Kairat played its first match here on 10 April 1960.
The stadium building is symmetrical, three storeys high and elliptical in plan; the portico on the north side is clad in granite. After Kazakhstan joined UEFA in 2002, a metal canopy weighing more than 350 tonnes was put up over the west stand. In 2009–2010 a major reconstruction costing 3 billion tenge was paid for from the city budget: the pitch was brought to 105 × 68 metres and new running tracks were laid. The stadium reopened on 18 September 2010.
On 30 September 2025 Kairat hosted Real Madrid at this stadium in the league phase of the UEFA Champions League and lost 0:5. In 2018 the club published a reconstruction concept by the German practice gmp, which proposed lowering the pitch by 10 metres, increasing capacity and keeping the historic facade. In 2023 the Almaty city administration announced an open competition for an architectural concept of the stadium and the adjoining area.
Compare
Capacity, seatsNo. 9 of 10. 27,196 seats less than the leader.
- 1Bishkek ArenaBishkek51,000
- 2Olympic StadiumAshgabat45,000
- 3Pakhtakor StadiumTashkent34,000
- 3Bunyodkor StadiumTashkent34,000
- 5Astana ArenaAstana30,000
- 5National StadiumDushanbe30,000+
- 7Kopetdag StadiumAshgabat26,503
- 820-Letie Nezavisimosti StadiumKhujand25,000
- 9Central StadiumAlmaty23,804
- 10Markaziy StadiumNamangan21,913
Uzbekistan 3 · Turkmenistan 2 · Kazakhstan 2 · Tajikistan 2 · Kyrgyzstan 1
On the map
Artistic models based on photographs. Some details are simplified. The movement of the Astana Arena roof is sped up for clarity.